City of Ontario Integrated Waste (City-owned roll-offs and temporary bins)
- Published sizes
- The City rate sheet effective July 1, 2026 lists 10-, 20-, 30- and 40-yard roll-offs for refuse, plus per-load rates for recycling, green waste and inert/C&D roll-offs, and a 7-day temporary bin (size not stated on the sheet). The City's commercial services page describes 30- and 40-yard roll-offs for refuse, recycling or green waste and an 11-yard box for heavy materials, so confirm the size when you order.
- Rental & weight terms
- Each roll-off pull is charged a flat per-load rate, and a disposal charge based on the load's weight is added after the box is serviced; the per-ton disposal rate is not published on the sheet. Loads over 12 tons pay an extra $115 a ton. A dry run or other haul charge is $369.29, and copies of weight slips are $14.70. The City's construction-recycling packet says C&D roll-offs must be serviced at least every two weeks, and that C&D loads contaminated with trash are charged as trash. Rental period limits for a household cleanout box are not published on the pages we read; ask for them in writing.
- Price basis
- Roll-off, any size (10 to 40 yards) and any material: $369.29 per load plus weight-based disposal (effective August 2026 billing). 7-day temporary bin rental: $95.00, additional empties within the 7 days $69.00. 7-day temporary green waste/recycling bin: $61.00, additional empties $30.50. Dead run on a temporary bin: $42.00. Prices are from the City of Ontario Integrated Waste rate sheet effective July 1, 2026.
Integrated Waste is part of Ontario Public Works, 1425 S. Bon View Avenue, Ontario, CA 91761; order or schedule through Customer Service at (909) 395-2050 (the Integrated Waste main line is (909) 395-2800, and construction-recycling questions go to (909) 395-2040 or CDRP@ontarioca.gov). The City's construction-recycling packet says third-party haulers are not allowed in Ontario under Municipal Code § 6-3.105 and that construction and demolition projects must use City hauling service, with self-hauling allowed only in equipment the project owns. Ask for a C&D-coded roll-off for remodel debris so the load is sorted for recycling; the City reports average diversion of about 77% on C&D accounts. The packet's FAQ still quotes an older $308.45 per-pull rate, so rely on the current rate sheet.
Sources: [1] · [2] · [3] · [4] · [8]Visit supplier website Direct link · No referral tracking